Overview
Alliance Centropolis is a mixed-use project by Alliance Group on Batumi's seafront. Its programme combines apartments with hotel, business and leisure spaces.
Gallery
Alliance Centropolis
Waterfront composition of three towers and a shared podium.

Indoor pool concept from the project's infrastructure section.

Entrance-level concept from the official project presentation.
At a glance
- Developer: Alliance Group
- Batumi waterfront location
- Three-tower composition
- Studios and one- and two-bedroom apartments
- Indoor pool and co-working space in the project programme
On the seafront
The project occupies a waterfront setting along Rustaveli Avenue. The sea and Batumi Boulevard form the immediate urban context.

Waterfront composition of three towers and a shared podium.
Three towers, one podium
The developer's visualisations show three towers joined by a shared podium. Curved outlines and horizontal balcony bands shape the composition.

Indoor pool concept from the project's infrastructure section.
Apartments and shared spaces
The official presentation includes studios and one- and two-bedroom apartments. Its planned infrastructure includes an indoor pool, co-working space and cinema.

Entrance-level concept from the official project presentation.
Location
Batumi
Construction reported
The official update dated 1 August 2026 reports the B tower structure up to 57 floors and concrete framework work on the A tower's eighth commercial floor. The 7 July 2026 update describes ongoing facade work on tower C.
The official materials reviewed give no single handover date for all towers. The schedule needs to be specified for each tower.
Presentation reviewed ·
Get in touch
Opens a Telegram chat. You will need to send the message yourself.
Sources
Project recordRecord C548
Project record
- Location
- Batumi
- Address in source
- Shota Rustaveli St, 52
- Developer
- Alliance Group
- Record type
- Project
- Construction stage
- Construction reported
- Sales status
- Not established
- Last research check
- 2026-10-15
- Record
- C548
Reported completion: 2028 Q4; 2029 Q4
Есть прямое публичное сообщение о стройке
Names and source excerpts are shown in their original language.Sources · Overview
Names and source excerpts are shown in their original language.
Официальный отчёт от 01.08.2026 описывает конструкции башни B до 57 этажей и монолит 8-го коммерческого этажа A.
Alliance Centropolis — Construction Progress
- Сопоставление: Alliance Group + Alliance Centropolis + Rustaveli 52 совпадают; alias Alliance City Batumi подтверждает старое имя.
- Статус различается по башням A/B/C. Сроки по башням проверять отдельно.
Buildings & sections 3
A building or section is a separate entry within a project’s source material. It may share a schedule with other buildings and may not be an independent construction phase. Parent and component relationships are displayed when known; uncertain matches remain separate.
| Name | Stage in source | Reported completion |
|---|---|---|
| Block CShota Rustaveli St, 52 | construction | 2028 · Q4 |
| Block AShota Rustaveli St, 52 | construction | 2029 · Q4 |
| Block BShota Rustaveli St, 52 | construction | 2028 · Q4 |
A source reference, subject to verification. Names and source excerpts are shown in their original language.
Sources
We bring together developer presentations, commercial directories, dated progress reports and selected planning material. Evidence quality varies. Each detail page links to the available sources; dates or completion claims should be checked directly with the relevant party.
- alliance.ge https://alliance.ge/en
- alliance.ge https://alliance.ge/en/live/alliance-centropolis
- centropolis.ge https://centropolis.ge/en?utm_source=korter.ge
- korter.ge https://korter.ge/en/alliance-centropolis-batumi
