NEXT Collection — Architectural rendering
Batumi · Project

Next Collection

NEXT

Architectural visualisation · NEXTImage source

Overview

Location

Batumi

Tamar Mepe Ave, 39

41.68717402, 41.70380509

View on map
Stage & schedule

Construction reported

Источник сообщает о стройке; актуальность и характер подтверждения указаны в записи

Reported completion: white frame 2027-06; turnkey 2027-12

Presentation reviewed ·

Floor plans

Floor plans

Drawings from developer materials. A floor plan does not confirm that a property is for sale.

Get in touch

Contact on Telegram

Opens a Telegram chat. You will need to send the message yourself.

Sources

Project recordRecord C1925

Project facts

Location
Batumi
Address in source
Tamar Mepe Ave, 39
Developer
NEXT
Record type
Project
Construction stage
Construction reported
Sales status
Not established
Last research check
2026-10-15
Record
C1925

Reported completion: white frame 2027-06; turnkey 2027-12

Stage in source

Источник сообщает о стройке; актуальность и характер подтверждения указаны в записи

Names and source excerpts are shown in their original language.
Sources · Overview

Names and source excerpts are shown in their original language.

Официальная карточка связывает проект с этапом строительства; официальный FAQ даёт будущую передачу.

NEXT Collection — official project page
  • Сохранить Batumi как муниципалитет, Green Cape/Mtsvane Kontskhi как поисковую локацию; каталог использует Makhinjauri. Граница требует координатной сверки.
  • Сопоставление: Имя Next Collection + Next Group + побережье у Botanical Garden совпадают; каталог Tamar Mepe 39. Разница Makhinjauri/Green Cape — граница поисковой локации, а не другой объект.
  • В FAQ используется Batumi; географически Green Cape вынесен отдельно. Уточнение white frame/turnkey: https://next-property.com/faq/project-facts-next-property/ .

Buildings & sections 1

A building or section is a separate entry within a project’s source material. It may share a schedule with other buildings and may not be an independent construction phase. Parent and component relationships are displayed when known; uncertain matches remain separate.

NameStage in sourceReported completion
Next CollectionTamar Mepe Ave, 39construction2027 · Q2

A source reference, subject to verification. Names and source excerpts are shown in their original language.

Sources

We bring together developer presentations, commercial directories, dated progress reports and selected planning material. Evidence quality varies. Each detail page links to the available sources; dates or completion claims should be checked directly with the relevant party.

  1. korter.ge https://korter.ge/en/next-collection-batumi
  2. next-property.com https://next-property.com/next-collection