Orangerie Hills
Orangerie Hills / Minda Saxli (юридическое лицо уточнить)
Overview
Gallery
Orangerie Hills
Project image from the catalogue
Location
Batumi
Announced / planned
Анонс / off-plan / предварительные продажи
Reported completion: первые 3 дома — декабрь 2027
Presentation reviewed ·
Get in touch
Opens a Telegram chat. You will need to send the message yourself.
Sources
Project recordRecord C4086
Project facts
- Location
- Batumi
- Address in source
- Niko Muskhelishvili I Lane 14e
- Developer
- Orangerie Hills / Minda Saxli (юридическое лицо уточнить)
- Record type
- Project
- Construction stage
- Announced / planned
- Sales status
- Not established
- Last research check
- 2026-10-15
- Record
- C4086
Reported completion: первые 3 дома — декабрь 2027
Анонс / off-plan / предварительные продажи
Names and source excerpts are shown in their original language.Sources · Overview
Names and source excerpts are shown in their original language.
Сайт проекта представляет 5 residences и дату передачи первых трех домов в декабре 2027.
Orangerie Hills — Exclusive Turnkey Villas in Batumi
- Bulk уточняет Niko Muskhelishvili I Lane 14e, Airport district Batumi. Адрес взять как отдельный каталоговый факт.
- Сопоставление: Имя точно совпадает; developer Minda Saxli Development согласуется с доменом mindasaxli.com. Уверенное соответствие, каталожный адрес не был независимо подтвержден первоисточником.
- Участки 400–700 м², villas 290–370 м². Один дом отмечен Sold. Подтвердить адрес, кадастр, permit и договорную компанию.
Buildings & sections 5
A building or section is a separate entry within a project’s source material. It may share a schedule with other buildings and may not be an independent construction phase. Parent and component relationships are displayed when known; uncertain matches remain separate.
| Name | Stage in source | Reported completion |
|---|---|---|
| Villa Aurelia | construction | 2028 · Q4 |
| Villa Neroli | construction | 2028 · Q4 |
| Villa Aira | construction | 2028 · Q4 |
| Villa Montelia | construction | 2028 · Q3 |
| Villa Marina | construction | 2028 · Q4 |
A source reference, subject to verification. Names and source excerpts are shown in their original language.
Sources
We bring together developer presentations, commercial directories, dated progress reports and selected planning material. Evidence quality varies. Each detail page links to the available sources; dates or completion claims should be checked directly with the relevant party.
- korter.ge https://korter.ge/en/orangerie-hills-batumi
- mindasaxli.com https://www.mindasaxli.com/