Overview
Gallery
Petra Sea Resort
Location
Kobuleti
Construction reported
Источник сообщает о стройке; актуальность и характер подтверждения указаны в записи
Reported completion: 2027 (page); whole development period 7 years
Presentation reviewed ·
Get in touch
Opens a Telegram chat. You will need to send the message yourself.
Sources
Project recordRecord C3119
Project facts
- Location
- Kobuleti
- Address in source
- Abashidze Street
- Developer
- Petra Group
- Record type
- Masterplan / collection
- Construction stage
- Construction reported
- Sales status
- Not established
- Last research check
- 2026-10-15
- Record
- C3119
Reported completion: 2027 (page); whole development period 7 years
Источник сообщает о стройке; актуальность и характер подтверждения указаны в записи
Names and source excerpts are shown in their original language.Sources · Overview
Names and source excerpts are shown in their original language.
Официальный masterplan включает более 30 жилых зданий и будущую сдачу.
Petra Group — Petra Sea Resort
- Tsikhisdziri, Kobuleti municipality; не город Kobuleti и не Batumi.
- Сопоставление: Одинаковое имя Petra Sea Resort и застройщик Petra Sea Resort/Petra Group, черноморский masterplan с отдельным Pullman. Каталог агрегирует как Kobuleti; официальный проект указывает Tsikhisdziri.
- MASTERPLAN: включает Petra Residences, Beachfront Apartments A/B/C и Pullman. Не складывать masterplan и его компоненты как отдельные площадки. Поисковый snippet ещё 2026, открытая страница уже 2027.
Buildings & sections 13
A building or section is a separate entry within a project’s source material. It may share a schedule with other buildings and may not be an independent construction phase. Parent and component relationships are displayed when known; uncertain matches remain separate.
| Name | Stage in source | Reported completion |
|---|---|---|
| Block AAbashidze Street | construction | 2028 · Q4 |
| Block BAbashidze Street | construction | 2027 · Q3 |
| Block CAbashidze Street | construction | 2026 · Q4 |
| Block D-1Abashidze Street | construction | 2027 · Q2 |
| Block D-2Abashidze Street | construction | 2027 · Q2 |
| Block D-3Abashidze Street | construction | 2027 · Q2 |
| Block D-4Abashidze Street | construction | 2027 · Q2 |
| Block K-1Abashidze Street | construction | 2027 · Q2 |
| Block K-2Abashidze Street | construction | 2027 · Q2 |
| Block K-3Abashidze Street | construction | 2027 · Q2 |
| Block K-4Abashidze Street | construction | 2027 · Q2 |
| Block K-5Abashidze Street | construction | 2027 · Q2 |
| Block K-6Abashidze Street | construction | 2027 · Q2 |
A source reference, subject to verification. Names and source excerpts are shown in their original language.
Sources
We bring together developer presentations, commercial directories, dated progress reports and selected planning material. Evidence quality varies. Each detail page links to the available sources; dates or completion claims should be checked directly with the relevant party.
- korter.ge https://korter.ge/en/petra-sea-resort-kobuleti
- petragroup.ge https://petragroup.ge/en/petra
