Piaza Residence
Tower Group
Overview
Gallery
Piaza Residence
Architectural rendering
Location
Batumi
Construction reported
Строится по каталогу; независимая актуальность не установлена
Reported completion: 2028 Q4
Presentation reviewed ·
Get in touch
Opens a Telegram chat. You will need to send the message yourself.
Sources
Project recordRecord C3414
Project facts
- Location
- Batumi
- Address in source
- Vakhtang Gorgasali St, 59
- Developer
- Tower Group
- Record type
- Project
- Construction stage
- Construction reported
- Sales status
- Not established
- Last research check
- 2026-10-15
- Record
- C3414
Reported completion: 2028 Q4
Строится по каталогу; независимая актуальность не установлена
Names and source excerpts are shown in their original language.Sources · Overview
Names and source excerpts are shown in their original language.
Официальный портфель помечает Ongoing project.
Tower Group — Portfolio
- Сопоставление: Официальный Piazza Residence в Old Batumi от Tower Group и каталожный Piaza Residence от Tower Group, Gorgasali 59, — тот же уникальный проект; Piaza/Piazza — вариант транслитерации.
- Не путать с готовыми зданиями у Piazza и рекламным описанием района.
Buildings & sections 1
A building or section is a separate entry within a project’s source material. It may share a schedule with other buildings and may not be an independent construction phase. Parent and component relationships are displayed when known; uncertain matches remain separate.
| Name | Stage in source | Reported completion |
|---|---|---|
| Piaza ResidenceVakhtang Gorgasali St, 59 | construction | 2028 · Q4 |
A source reference, subject to verification. Names and source excerpts are shown in their original language.
Sources
We bring together developer presentations, commercial directories, dated progress reports and selected planning material. Evidence quality varies. Each detail page links to the available sources; dates or completion claims should be checked directly with the relevant party.
