Prime Batumi — Project image from the catalogue
Batumi · Project

Prime Batumi

Star Zasa Construction

Project image · format unconfirmed · Korter.geImage source

Overview

Location

Batumi

Airport Highway, 185

41.60893304, 41.61429446

View on map
Stage & schedule

Construction reported

Источник сообщает о стройке; актуальность и характер подтверждения указаны в записи

Reported completion: Q1 2027 (первые учётные здания)

Presentation reviewed ·

Get in touch

Contact on Telegram

Opens a Telegram chat. You will need to send the message yourself.

Sources

Project recordRecord C3922

Project facts

Location
Batumi
Address in source
Airport Highway, 185
Developer
Star Zasa Construction
Record type
Project
Construction stage
Construction reported
Sales status
Not established
Last research check
2026-10-15
Record
C3922

Reported completion: Q1 2027 (первые учётные здания)

Stage in source

Источник сообщает о стройке; актуальность и характер подтверждения указаны в записи

Names and source excerpts are shown in their original language.
Sources · Overview

Names and source excerpts are shown in their original language.

Korter: 2 учетных дома строятся, Q1 2027; masterplan 16 buildings, 4 этажа; есть apartments и villas.

Prime Batumi — Korter
  • Сопоставление: Точное название, Star Zasa Construction и Airport Highway 185. Villas и apartments — форматы внутри одного проекта.
  • Смешанный формат; отделить виллы от apartments. 16 masterplan buildings не равно 16 текущих строек.

Buildings & sections 2

A building or section is a separate entry within a project’s source material. It may share a schedule with other buildings and may not be an independent construction phase. Parent and component relationships are displayed when known; uncertain matches remain separate.

NameStage in sourceReported completion
Prime BatumiAirport Highway, 185construction2027 · Q1
Block АAirport Highway, 185construction2027 · Q1

A source reference, subject to verification. Names and source excerpts are shown in their original language.

Sources

We bring together developer presentations, commercial directories, dated progress reports and selected planning material. Evidence quality varies. Each detail page links to the available sources; dates or completion claims should be checked directly with the relevant party.

  1. korter.ge https://korter.ge/en/prime-batumi