Queen's Residence — Architectural rendering
Batumi · Component / phase

Queen's Residence

TEMPO Holding

Architectural visualisation · TEMPO HoldingImage source

Overview

Location

Batumi

Adlia St, 53

41.61847776, 41.59764039

View on map
Stage & schedule

Mixed stages / expansion

Частично сдан / дальнейшие очереди или расширение

Reported completion: Block A opened 2026-09-22; Block B 2027

Presentation reviewed ·

Get in touch

Contact on Telegram

Opens a Telegram chat. You will need to send the message yourself.

Sources

Project recordRecord C3300

Project facts

Location
Batumi
Address in source
Adlia St, 53
Developer
TEMPO Holding
Record type
Component / phase
Construction stage
Mixed stages / expansion
Sales status
Not established
Last research check
2026-10-15
Record
C3300

Reported completion: Block A opened 2026-09-22; Block B 2027

Stage in source

Частично сдан / дальнейшие очереди или расширение

Names and source excerpts are shown in their original language.
Sources · Overview

Names and source excerpts are shown in their original language.

Block A открыт 22.09.2026; отдельная статья сообщает Block B к вводу в 2027.

TEMPO — phased completion and new projects
  • Сопоставление: Queen’s/Queens Residence + TEMPO + точный Adlia 53 совпадают; каталог alias Queens Residence. Передача Block A и будущий Block B — фазы одного ЖК.
  • Общие заголовки «Queens completed» относятся к первой фазе. Комплекс целиком не исключать из будущих/текущих.

Buildings & sections 2

A building or section is a separate entry within a project’s source material. It may share a schedule with other buildings and may not be an independent construction phase. Parent and component relationships are displayed when known; uncertain matches remain separate.

NameStage in sourceReported completion
Block AAdlia St, 53construction2026 · Q4
Block BAdlia St, 53construction2027 · Q4

A source reference, subject to verification. Names and source excerpts are shown in their original language.

Sources

We bring together developer presentations, commercial directories, dated progress reports and selected planning material. Evidence quality varies. Each detail page links to the available sources; dates or completion claims should be checked directly with the relevant party.

  1. bm.ge https://bm.ge/en/news/tempo-plans-to-launch-a-new-project-every-year-for-the-next-four-years
  2. korter.ge https://korter.ge/en/queens-residence-batumi
  3. tempoholding.ge https://tempoholding.ge/queens