Stefane Zubalashvili St, 12a
Argo Group XXI
Overview
Gallery
Stefane Zubalashvili St, 12a
Project image from the catalogue
Location
Batumi
Construction reported
Строится по каталогу; независимая актуальность не установлена
Reported completion: 2026 Q3
Presentation reviewed ·
Get in touch
Opens a Telegram chat. You will need to send the message yourself.
Sources
Project recordRecord C3958
Project facts
- Location
- Batumi
- Address in source
- Stefane Zubalashvili St, 12a
- Developer
- Argo Group XXI
- Record type
- Project
- Construction stage
- Construction reported
- Sales status
- Not established
- Last research check
- 2026-10-15
- Record
- C3958
Reported completion: 2026 Q3
Строится по каталогу; независимая актуальность не установлена
Names and source excerpts are shown in their original language.Buildings & sections 1
A building or section is a separate entry within a project’s source material. It may share a schedule with other buildings and may not be an independent construction phase. Parent and component relationships are displayed when known; uncertain matches remain separate.
| Name | Stage in source | Reported completion |
|---|---|---|
| Stefane Zubalashvili St, 12aStefane Zubalashvili St, 12a | construction | 2026 · Q3 |
A source reference, subject to verification. Names and source excerpts are shown in their original language.
Sources
We bring together developer presentations, commercial directories, dated progress reports and selected planning material. Evidence quality varies. Each detail page links to the available sources; dates or completion claims should be checked directly with the relevant party.
- korter.ge https://korter.ge/en/stepane-zubalashvili-st12a-batumi